Bathroom Installations Across Glasgow & Central Scotland
MKS Construction installs and renovates bathrooms across Glasgow, Kirkintilloch, East Dunbartonshire and Scotland's Central Belt. From straightforward suite replacements to full reconfiguration with new plumbing, tiling and underfloor heating — we handle every trade and deliver a finished room, not a half-done project.
Full Bathroom Renovations
A bathroom renovation involves more trades than most people expect. We manage the lot — from strip-out and disposal through to plumbing first fix, electrical work, waterproofing, tiling, suite installation and final snagging. For homeowners comparing renovation and extension budgets, our guide to extension costs in Glasgow explains the main factors that affect overall project cost.
Strip-out and disposal
Plumbing first fix (including re-routing waste and supply pipes)
Electrical first fix (extractor fans, heated mirrors, underfloor heating, lighting)
Tanking and waterproofing (essential for wet rooms and walk-in showers)
Wall and floor tiling
Suite installation — WC, basin, bath or shower
Plastering, decoration and final snagging
Wet Rooms
Wet rooms are increasingly popular — no shower tray, fully tanked and tiled floor to drain. We build wet rooms to current standards with proper gradient falls, membrane systems and drainage. Ideal for ensuites, accessible bathrooms and loft conversions.
What We Install
Walk-in showers and shower enclosures
Freestanding and built-in baths
Wall-hung and back-to-wall WCs
Vanity units and countertop basins
Electric and plumbed heated towel rails
Underfloor heating (electric and water-fed)
LED mirrors and recessed lighting
Wall and floor tiling — porcelain, ceramic, natural stone
Our Approach
Site visit — We assess the existing layout, discuss what you want and flag any issues (waste runs, ventilation, structural)
Design & quote — Itemised pricing. No vague allowances — you'll know what you're getting
Programme — Most bathroom installs take 1-2 weeks. We agree a timeline and stick to it
Build — All trades coordinated by us. One point of contact, regular updates
Handover — Final snagging, clean-up and sign-off
Bathroom work often forms part of a bigger project — a full renovation, a loft conversion or extension adding an ensuite, or a new build needing all wet rooms fitted out. Whatever the scope, we handle everything under one roof. If you're also planning a kitchen, we can programme both to run efficiently.
Why MKS?
One contractor, all trades — plumbing, electrics, tiling, joinery, plastering. No subcontractor juggling for you
QS-led pricing — Transparent costs from day one. No hidden extras at the end
Constructionline Gold & SSIP — Accredited to the standards demanded by major clients and insurers
Areas We Cover
Glasgow, Kirkintilloch, Bishopbriggs, Bearsden, Milngavie, Lenzie, East Dunbartonshire, North Lanarkshire, Edinburgh and the wider Central Belt.